基于工程造价的合理确定控制探讨

 摘要:建设工程造价是贯穿于建设全过程的管理,即从设计任务书,投资估算开始至
项目竣工结算为止的整个过程。建设项目工程造价的合理确定和有效控制是工程建设管理
的重要内容。始终贯穿于工程造价管理的全过程。只有合理确定工程造价,通过有效手段

 

控制好各阶段建设费用,才能达到理想的目的,确保建设项目保质按期完工。

 

 

 

  关键词:工程造价 投资估算 设计概算
  Abstract: construction engineering cost is throughout the whole process of management in 
construction, that is, from the design plan descriptions, investment estimation began to project 
completion and settlement of the whole process so far. Construction project construction cost and 
the reasonable determination of the effective control of project construction and management is an 
important content. Run through the whole process of project cost management. Only reasonably 
determine the engineering cost, through the effective methods to control the construction cost each 
stage, to achieve the ideal purpose, to ensure the quality of construction projects completed on 
time. 
  Keywords: engineering cost investment estimation design budgetary estimate 
  
 

 

   所谓工程造价的合理确定,就是在建设程序的各个阶段,合理确定投资估算、概算

 

造价、预算造价、合同承包价、结算价、竣工决算价。

 

   1 

 

我国工程造价管理现状

 

   (1)目前我国工程造价管理重点在建设项目实施阶段,只重视建设项目的承包价、
实施过程的变更造价以及结算价,而对工程可行性研究阶段和初步设计阶段造价管理没
有给予足够的重视,产生这种现象的根源是一些人存在着一个错误的认识,即可行性研
究阶段的投资估算和初步设计阶段设计概算是虚拟资金、是准现实的,而在建设项目实施

 

阶段所发生的资金才是真实的。

 

   (2)工程造价管理一直重视造价的控制,轻视造价的合理确定,没有处理好二者
的关系,使我们陷入了一个死循环,我们一直在寻找控制工程造价的方法,但收效甚微 ,
因而出现了头疼医头,脚疼医脚的片面现象。很少有人提到工程造价失控的一个重要原因

 

是我们没有足够重视可行性研究阶段和初步设计阶段工程造价的合理确定。
  2 

 

合理确定工程造价的必要性

  合理确定工程造价是有效控制工程造价的前提和条件,二者存在相互依存、相互制约
的辩证关系。有效地控制工程造价的首要任务是合理确定工程造价,其中投资估算是形成
工程造价的源头,合理确定投资估算又是工程造价控制的基础和载体。其次,有效地控制
工程造价离不开工程造价的合理确定,工程造价的有效控制建立在工程造价的合理确定
基础之上,工程造价的合理确定是绝对的、主动的,工程造价的有效控制寓于工程造价确
定的全过程,工程造价的确定过程也就是工程造价的控制过程,二者的目的是同一的,

 

即合理使用建设资金,提高投资效益,维护有关各方面合理的经济利益。
  3

 

如何合理地确定投资估算和设计概算

  3.1

 

投资估算的合理确定

  投资估算是供建设项目决策的依据,直接关系到国民经济评价及财务分析结果的可
靠性、正确性。可行性研究阶段是产生工程造价的源头,投资估算必须科学合理,按客观
经济规律办事。工程造价管理人员要在方案优化基础上,编制出高质量投资估算,编制投
资估算的可行性研究报告一定要达到国家规定的深度,否则不能做为编制投资估算的依