孔内深层强夯法在处理杂填土地基的应用

 高 晰   陸 欣  邓中华 (中铝贵阳铝镁设计研究院  550004)

李恩怀

  刘 靖  张 琦 (中铝贵州分公司  550008)

[提要]:随着建筑用地的日趋紧张,越来越多的建筑物建在高填方、垃圾场及其它欠固结的软土层上,软土层的

地基加固处理问题已引起设计的高度重视。本文通过工程实例

,介绍了孔内深层强夯技术在加固杂填土高填

方土中的应用

该工法通过高动能和超压强在孔内深层强夯,使孔内填料在高压强状态下动

力固结,对桩间土产生强力的挤密作用,使桩间土的挤密程度高,从而到了较理想的地基

加固效果。实例

并提出

了孔内深层强夯法复合地基承载力的计算方法和检测手段,以及

设计注

意的相关问题

,可供设计人员参考。

[关键词]:深层强夯,地基加固,复合地基,承载力检测

Guiyang  Aluminum-Magnesium  Design  &  Research  Institute  Chinalco,  Guizhou  Branch/Gao  Xi

,Lu  Xin

,Deng Zhong Hua

,

Li  Nn  Huai

,  Liu  Jing

,  Zhang  Qi

(1  Guiyang  Aluminium-Magnesium  Design  &  Research  Institut

e,  Guizhou 

550004 China

; 2 Guizhou Branch Chalieco, Guizhou 550008 China)

ABSTRACT: As time elapsing, the land for building construction becomes more and 
more tight,  more  and  more  buildings  have  to  be  constructed on  the  high  backfilling, 

garbage  disposal  and  other  unconsolidated 

soft 

strata.  Therefore,  the  consolidation 

treatment  for  the  soft  foundation  bed  has  drawn  high

ly

  attention  to  the  engineering 

field.  The  paper  introduced  through  engineering  practice  the  application  of  SDDC 
(Super Down Hole Dynamic Compaction) on 

consolidating the mixed backfilling and 

high backfilling 

with rubbish . Via the forced SDDC with the high kinetic energy and 

super  pressure.the  backfilling  in  the  hole  under  the  high-strength  state  shall 

dynamically become consolidated while strongly compacting the earth between piles 
and making the earth in high density,which desirably strengthens the foundations. The 

paper  also  offers  the  method  and  means  for  calculating  and  testiong  the  bearing 
capacity  of  SDDC  foundation 

and  highlighted  the  relevant  issues  to  be  cared  in  the 

engineering design as reference information for the designers.

Key words: SDDC(Super Down Hole Dynamic Compaction). Foundation be consolidation. Compound foundation 
bed. Bearing capacity

 test.

0   

工程概况

工程概况:中国铝业贵州分公司四期电解铝工程,是中铝集团的重点项目

该工程位于贵州分公司三电解的北侧,占地面积约

  26  万  m

2

。其主要生产车间为

4  栋铝电解厂房,厂房跨度  24m,柱距  6.3m,长度  530m,厂房高为  15m。

1