SOE020408BJ(GB)-workshop
1
Based on achievement on KPIs and competencies, two Performance Level ratings are
established. For KPIs - reaching stretch targets translates to PL1 rating, while reaching
Hoshin targets (which are 20%-40% lower than stretch targets) translates to a PL3 rating.
Based on the weighted average of the two PL ratings, a combined PL rating can then be
calculated.