电气工程
Electric Works
一、工艺流程图
Technological process Diagram
二 、 电 气 安 装 质 量 控 制 点 及 控 制 措 施
Quality Control Point and Control
Measure on Electric Installation
分项工程
Sub-item
质量控制点
Quality Control Point
质量控制措施
Quality Control Measure
备注
Remark
施 工 准 备
Construction
Preparation
材料计划、材料送审、施工方案
Material plan, material review
and approval, and construction
program
认真编制
Work out carefully
明管安装
Open–pipe
installation
位置、标高正确、接地良好
The position and elevation are
correct, and the grounding is
good
绘制综合图及管路接地大样图
Draw integrated drawing and
detail of pipeline grounding
桥架线槽安装
Installation
on
crane
span
structure slot
标高准确、吊架安装、穿墙、楼板的防
火处理、与其它专业管道的间距
Correct level, installation on
hanger frame, fire protection
treatment of through-wall and
floor, clearance with other
special pipeline
绘制综合图、吊架安装图、防火处
理大样图
Draw integrated drawing,
installation drawing of
hanger frame, and detail of
fire protection treatment
穿线配线
Threading
distribution
接线正误、导线涮锡、导线损伤
Wiring
correct
error,
conducting wire with rinsing
tin, conducting wire with
damage
严格执行接线图、涮锡
穿线时注意保护导线
Strictly carry out wiring
drawing, rinsing tin, pay
attention to protecting the
wire when threading
电缆敷设
Cable lay
电缆平直、固定牢固、电缆弯扁度、标
识
Straight cable, firm fixing,
cable
bending,
and
identification
落实图纸、规范相关要求
Implement
requirements
relating to drawing and
specification
焊接点
Soldered dot
焊接部位的接地电阻、焊点表面光滑
饱满
Ground resistance at welded
position, and the surface at
welded point is smooth and full
焊接完成后测试焊接部位的接地
电阻
Test the ground resistance of
welded position after
finishing the welding.
器具安装
Appliance
installation
位置正确、安装牢固、观感良好
The position is correct and
installed
firmly,
the
appearance is good.
按绘制的机电综合图、表面器具布
置平面图安装
Arrange the plan installation
according
to
electromechanical
drawn
integration diagram and
surface appliance
调试
Debugging
系统运行的稳定性、运行的可靠性、
绝缘摇测
Operating stability, reliability,
and insulating shake-measure
in system
制订专项调试方案
Work out the special
debugging plan
三 、 关 键 工 序 技 术 及 质 量 控 制 保 证 措
Key Working Procedure and
Quality Control Guarantee Measure
1、镀锌钢管明敷设 Open Lay of Galvanized Steel Pipe
本工程明敷设钢管均采用了镀锌钢管明敷设工艺。
All open-lay steel pipes in the project adopt the open-lay technology of galvanized steel pipe.
(1)工艺流程 Technological process:
(2)可上人的吊顶内以及不封闭式竖井通道内的配管为明配管,其管路走向及支架固定均
应按明配管要求施工。
The distributing pipe in suspended ceilings that can be entered into and shaft passages that are not
closed is open. Both its pipeline direction and support fixture should construct according to
requirements of open distributing pipes.
(3)按设计要求用冷煨法把管子煨出所需的弯度,20mm 以下管径的管子用手板煨管器,
8-
41
施
工
准
备
管路明敷
管路暗敷
管内穿线
器具安装
电缆敷设
设备安装
线槽安装
防雷与接地施工
调
试
母线安装
installation
preparation
pipe interior wire laying
instrument installation
cable laying
equipment installation
debugging
naked pipe installation
covered pipe installation
tray wire fillister
lightning-protection earth engineering
sealed bus-bar arrangement
施工准备
支吊架、弯管预制
测定盒箱及固定点位置
支吊架固定
盒箱固定
管路敷设
沉降缝处理
跨接地线
Construction
preparation
Suspender and
siphon prefabricated
The position of the
mensuration box and root
Suspende
r fixation
Box fixation
Pipeline
layout
Slot dealing
Ground line