Abstract
This article describes a hotel room management system development process.
Gave in-
depth articles from the needs analysis, system analysis, outline design, detailed design, testing
and debugging, as well as the entire development process, summed up the experience in the
development process and improve the system's future direction. Guided by the Software
Engineering. This system uses Microsoft Visual Studio 2008 and SQL Server 2000 takes the
development kit.
This system mainly realized six function parts: Reception management, finance center,
check center, Stat. report, foundation information, system setup. Reception management
module for preconcert room、cancel reservation、enter room、room consume、exchange
room、quit room so on; finance center module for fill bill、hand over to the next shift and refer
so on; check center module for check enter、check history roomer、check reservation and
check counter so on; Stat. report module for enter report、room consumed report、settle
accounts report 、 business day report and enter Stat. report so on; foundation information
module for operator management and room management so on; system setup module for
purview management、system setup、data backup、data recovery.
Keywords:
Hotel; Database; Management System
II