background image

Abstract

This article describes a hotel room management system development process.

 

Gave in-

depth articles from the needs analysis, system analysis, outline design, detailed design, testing 

and debugging, as well as the entire development process, summed up the experience in the 

development  process  and  improve  the  system's  future  direction.  Guided  by  the  Software 

Engineering. This system uses Microsoft Visual Studio 2008 and SQL Server 2000 takes the 

development kit.

This system mainly realized six function parts: Reception management, finance center, 

check  center,  Stat.  report,  foundation  information,  system  setup.  Reception  management 

module for preconcert room、cancel reservation、enter room、room consume、exchange 

room、quit room so on; finance center module for fill bill、hand over to the next shift and refer 

so on; check center module for check enter、check history roomer、check reservation and 

check counter so on; Stat. report module for enter report、room consumed report、settle 

accounts  report 、 business  day  report  and  enter  Stat.  report  so  on;  foundation  information 

module  for  operator  management  and  room  management  so  on;  system  setup  module  for 

purview management、system setup、data backup、data recovery.

Keywords:

 

Hotel; Database; Management System

II