ABSTRACT
This design includes of three parts: the general part, special subject part and translated part.
The general part is a new design of Wanglou mine. Wanglou mine lines in northwest of JiNing in
ShangDon province. The traffic of road and railway is very convenience to the mine.
The proved reserves of the minefield are 49.45 million tons. The recoverable reserves are34.48
million tons. The normal flow of the mine is 60 m
3
percent hour and the max flow of the mine is 140
m
3
percent hour. The mineral well gas gushes the deal higher, for high gas mineral well. Coal doesn't
contain Bang risk.
The designed productive capacity is 0.60 million tons percent year, and the service life of the mine
is 48.8 years. The working system “two nine-one six ” is used in the yangquan mine. It produced
300d/a.
The colliery adopts coal method is the alignment long the wall synthesizes to mechanize to adopt
once the all and high method mines. The length of working-face is 200m.
This design includes eight chapters: 1.An outline of the mine field geology; 2.Boundary and the
reserves of mine; 3.The service life and working system of mine; 4.development engineering of
coalfield; 5.The layout of panels; 6.The method used in coal mining; 7.Transportation of the
underground; 8.The lifting of the mine.
Special subject part:
Special subject is << The fully-mechanized coal mining face pressure
detection and motion laws >>.
Translate the part:
Control and prevention of gas outbursts in coal mines.
Keywords:new well design once mile all support core
目 录
附图