background image

水利工程施工组织设计

  录

内容摘要............................................................................................................................................... 1

   

.................................................................................................................................................... 4

1   综述................................................................................................................................................... 5

1.1 编制依据..........................................................................................................................................5
1.2 施工与编制的指导思想..................................................................................................................5
1.3 编制内容..........................................................................................................................................6
1.4 项目目标..........................................................................................................................................6

1.4.1 工期目标.....................................................................................................................................6
1.4.2  
质量目标....................................................................................................................................6
1.4.3  安全目标....................................................................................................................................7
1.4.4 
文明施工.....................................................................................................................................7

1.5 工程特点及工艺措施......................................................................................................................7

2  工程概况及施工条件...................................................................................................................... 8

2.1 工程概况..........................................................................................................................................8
2.2 水文气象条件..................................................................................................................................9
2.3 工程地质与水文地质......................................................................................................................9
2.4 水源电源条件..................................................................................................................................9
2.5 原有通讯及输电线路情况..............................................................................................................9

3   施工现场规划与总平面布置....................................................................................................... 10

3.1 施工总平面布置图及说明书........................................................................................................10

3.1.1 总体原则...................................................................................................................................10
3.1.2 
施工临时设施场区选定说明...................................................................................................10

3.2 混凝土拌和系统............................................................................................................................10
3.3 砂石料系统....................................................................................................................................10
3.4 混凝土预制构件予制场................................................................................................................11
3.5 模板及钢筋加工场........................................................................................................................11
3.6 大型机械布置................................................................................................................................11

4  施工总进度计划与工期保证措施............................................................................................... 12

4.1 合同工程项目及主要工作量........................................................................................................12
4.2 工期目标与控制性工期................................................................................................................13

4.2.1 本工程总工期...........................................................................................................................13
4.2.2 
控制性工期...............................................................................................................................13

5  施工围堰.......................................................................................................................................... 14

5.1 范围................................................................................................................................................14
5.2 下游围堰施工方案........................................................................................................................14

6  土方工程施工方案......................................................................................................................... 15

6.1 说明................................................................................................................................................15
6.2 施工进度计划................................................................................................................................15

2