ABSTRACT

According to the design of the power load data Pengzhou Zhongxin Metallurgical 

Industry  Co.,  analyze  load  trends,  safety,  economic  and  reliability  considerations,  to 

determine the main wiring connections; through power load calculation and determine 

the scope of the number of units of the main transformer and capacity, by calculating the 

short-circuit  current,  high-voltage  electrical  equipment  is  selected,  the  last  part  of  the 

mine  were  calculated  and  analyzed  to  determine  the  method  of  mine,  completed  the 

preliminary design of the electrical part of 35KV substation.

Key wordsConverting stationTransformer substationElectrical wiring; The 

Calculation of short current