background image

建筑工程造价预算问题分析

    摘要:当今社会是市场经济,任何工程项目都带有市场性、经济性。工程造价控制涉及到建
筑市场商品经济的各要素。工程造价预算是工程建设的重要组成部分,它对于控制工程投资,
缩短建设时间,提高业主投资效益具有重要作用。本文研究建筑工程造价预算控制问题,并
对建筑工程造价超预算的原因进行分析,并提出了加强建筑工程造价预算控制的策略。

 

  关键词:建筑工程;预算造价;预算控制;原因;措施

 

   

Abstract:  in  today's  society  is  a  market  economy,  any  project  with  marketability  and 

economy. Project cost control involves the construction market all the elements of the commodity 
economy. Project cost budget is the important part of the construction engineering, it for control of 
the project investment, shorten the construction time, improve the benefit of investment plays an 
important  role.  In  this  paper,  the  construction  cost  budget  control  problems,  and  building 
engineering  cost  budget  analysis  of  the  causes,  and  put  forward  the  strengthen  building  project 
cost budget control strategy. 
  

Keywords: building engineering; Budget cost; Budget control; Reason; measures 

  

 

  建筑工程预算造价在工程造价管理中占有举足轻重的地位。由于受到市场、人为因素等
的影响,先期的造价预算经常困无法完全预见建筑工程项目实施过程中所发生的突发事件
而致使造价预算出现偏差,超预算的现象屡见不鲜,这显然不利于对工程造价的控制。建筑
工程造价预算是整个建筑工程项目进行有效控制的重要手段,是建筑工程招标和投标的重
要依据。因此,提高建筑工程造价预算,是建立高效建筑市场的一个重要措施。

 

  

 

  

1 建筑工程造价预算中常见问题 

  

1.1 建筑工程造价预算定额的问题 

  在建筑工程造价预算过程中,经常会出现借用定额的现象。所谓的定额就是在合理的劳
动组织和合理的使用材料和机械的条件下,预先完成单位合格产品的消耗资源数量的标准。
在进行借用定额的过程中,势必会给建筑施工企业带来一定程度的影响。因此,要根据现实
情况,对定额的使用进行有针对性的制定出相应的措施。对于各个区域以及施工内容的不同,
对定额要进行适当的做出调整,能够使经济效益得到有效的提高。

 

  

1.2 建筑工程施工预算容易失控 

  建筑工程造价预算中的是施工造价,就是对建筑工程进行施工过程中材料价格的预算
通常情况下,对建筑工程仅限的几种材料价格不计算间接费用,但是在实际应用过程中,
需要的材料会达到上百种之多,除了仅限的几种材料价格不计算间接费用以外,其余的都
要计入建筑工程的直接费用中。因此,导致了材料越多费用就越增加,而且我国各个地区的
材料价格都不同,过高过低的现象普遍存在。直接造成了建筑工程造价预算的不准确,使工
程造价容易失控。

 

  

1.3 间接费用及其他费用应该根据工程情况自行报价 

  间接费用及其他费用的档次,应该根据建筑工程的特点、性质、类别与等级的不同进行
划分,只有这样才能够利于建筑工程施工充分的适应我国市场经济体制的发展与需求,并
且有利于我国政府部门在职能中的有效转变,最终会使建筑工程逐渐的向世界靠拢,促进
我国建筑行业经营机制的转变。

 

  

1.4 人为因素对工程编制影响较大 

  在进行建筑工程造价预算过程中,其中对工程编制造成较大影响的是人为的因素。一般