Abstract

This course is designed primarily the electrical wiring in a 10KV transformer station Factory , 

which involved the transformer to the cable, the choice of bus bar and cable options, the compensation 

of wattless power , relays, the fuze protection.  The main problem of the Transformers into the project is 

the selection of high-tension cable lines, we choice the different models of electricity which was based 

on loading of the district. 

With  the  introduction  of  several  transformers  for  power  supply,  the  introduction  of  sub-bus  bar, 

according to the principles of the average load in two separate generating lines, distributing the loads in 

two separate generating line.

 

Electricity lord connects line is the vital link of transformer substation in 

power  plant,  the  draft  of  the  electricity  lord  connects  line  relates  directly  to  the  choice  of  the  whole 

substation's electric equipments, the arrangement of the distribution electricity device, the determination 

of the relay protection of power system and the automatic device, It is a decisive factor of the invests 

size to the transformer substation electricity part.

We  use  to  the  method  of  complete  concentration  to  compensate  the  wattless  power  .For  each 

line; we have a relay, coupled with fuze protection. The design of the power supply system is a rather 

integral design; there are certain reference values to next design.

Keywords 

the  design  of  power;transformer;breaker 